6230-14 TERMINAL BUILDING REHABILITATION AT TAMPA EXECUTIVE AIRPORT

R L Burns completed the removal and re-installation, with flashing and sealant modifications, of 65 exterior windows located at the Tampa Executive Airport Terminal Building. This work was performed to correct water intrusion issues. The Work included repair of interior finishes at window locations to correct water damage. Other exterior work included minor repairs to […]

T-1151 CARILOHA TENANT BUILD OUT

The Cariloha Bamboo Retail Build out at OIA (Orlando International Airport) consisted of the demolition of existing finishes and renovation of 1,086 sq.ft. of retail space. The scope of work included the removal of existing finishes, removal and replacement of exterior retail store signage and security grill   roll-up door.  New Storefront wall tile finishes, storefront […]

V-777 NORTH TERMINAL MOVING SIDEWALK REMOVAL LEVEL 3 LANDSIDE TERMINAL

RL Burns  provided  clean up and patching of floors, walls and ceilings in the “back of house” area, repairs to walls, doors and wall penetrations and the addition of new acoustical ceilings in 4 offices.  New metal stud and drywall work at existing walls needing to be brought up to appropriate fire rating (including fire […]

V-678 HYATT PUBLIC RESTROOM RENOVATIONS PHASE L

Provide a complete set of drawings, materials, labor and equipment necessary for renovations of an existing area. Removal of all the wall finishes to the metal studs in preparation for new cement board and drywall.  Remove and replace the wet walls behind the toilets and urinals and the adjacent janitor’s closet wall so the new […]

V-451 FULL SCALE MOCKUP, D/B OF LANDSIDE LEVEL 3 RESTROOM RENOVATION

The V-451 Restroom Renovation project consisted of the design and renovation of two restrooms within the main terminal building. The project team worked very closely with the chosen Architect and GOAA staff to define a scope of work and approved design for the budget allowed for this prototype. The restroom was re-configured to meet current […]

DESIGN/BUILD UNITED AIRLINES VIP LOUNGE

The project consists of interior renovations of United Airlines spaces containing Training, Technical Operations, Locker Rooms and Flight Operations areas.  Additionally, a storage area that required demo of an existing fence and re-installation of a new chain link fence.  The phasing and coordination for the project was complicated by the fact that four of the […]

T-1209 NUANCE DUTY FREE SHOP AIRSIDE 1 EXPANSION

R L Burns completed the expansion of the Duty Free Retail store on Airside 1 at Orlando International Airport. The footprint of the existing store was expanded approximately 3,300 Sqft into an adjacent holdroom area. The scope of work included: interior demolition, core drilling, metal framing and drywall, wall blocking, metal column covers, painting, rough […]

ORLANDO INTERNATIONAL AIRPORT – T-1246 SILVER AIRWAYS REFURBISHMENT

R L Burns was selected as the Design-Builder to renovate the former Comair Hangar for use as Silver Airway’s maintenance hangar and office building.  The scope of work consisted of interior demolition, reconfiguration of office layout, upgrades to interior finished, replacement of hangar doors, construction of new façade with metal wall cladding, upgrades to MEP […]

ORLANDO INTERNATIONAL AIRPORT – BP-427 CCTV RENOVATION

The BP-427 CCTV Renovation project consisted of the construction of new and modified infrastructure required to support the renovation of the closed circuit television system (CCTV) and all other related services at the personnel and baggage screening locations throughout the Landside and Airside terminals at the Orlando International Airport. The scope of work included among […]

V-549 Landside A Level 2 and 3 Rehabilitation

The V-549 Landside A Level 2&3 Rehabilitation Project consists of various upgrades to existing landside airlines ticket and baggage office spaces. The upgrades included revisions to the architectural layout, new ticket counters and scales, upgrades to architectural finishes, modifications, and addition of casework, modifications to the HVAC, plumbing, fire protection, security and IT systems. The […]