ABOUT THE PROJECT

Provide a complete set of drawings, materials, labor and equipment necessary for renovations of an existing area. Removal of all the wall finishes to the metal studs in preparation for new cement board and drywall.  Remove and replace the wet walls behind the toilets and urinals and the adjacent janitor’s closet wall so the new stall locations are ADA compliant.  Remove the ceiling drywall and suspended ceiling framing system and replace with a metal stud and drywall system.  Install the new owner furnished floor tile using a Laticrete Hydro Ban system which includes a crack membrane waterproofing system over the floor and 4” inches up the walls.  Furnish and install the counter tops, mirrors, lighting, partitions and doors.

DETAILS

Firm’s Responsibility: General Contractor
Project Type: Design/Build
Client: Greater Orlando Aviation Authority
Completion Date: March 2013
Construction Value: $272,011